Comanche easement maintenance, below are the photos for the before and after maintenance work. This project is downstream off of Comanche Road, north of Hood Road. The total project cost was $6700.00 Concrete debris in easement bottom Looking east from Comanche, cleaned easement Erosion between block wall and slope paving Filling in erosion behind the
Acapulco Rd. Improvements Project Construction was completed on 07/07/2017 The purpose of this project was to provide permanent protection over the top of the recently constructed storm drain (Completed with Alberta Rd. project). This project provided curb & gutter and asphalt paving along approximately 430-feet of Acapulco Rd., south of Alberta Ave. in Rio
This project was complete the beginning of January 2017. Northeast corner looking south at the outlet pre-construction-showing ponding where invasive species took over limiting infiltration Enchanted Hills Dam was constructed in 2002, for the protection of NM528 to reduce the flow of stormwater coming off of the upstream area. The area above
Alberta Watershed Improvements, Phase 2 The Alberta Watershed Improvements, Phase 2 project, consists of the installation of approximately 3,640 linear feet of storm drain with diameters ranging from 24” to 54”, paving of Alberta Dr. from Saratoga to NM528, installation of curb and gutters along Alberta Dr., and associated manholes and curb inlets