High Range Detention Pond

PROJECT PURPOSE:

Construction of the High Range Detention Pond will protect downstream neighborhoods and roads from flooding, and assist with removal of sediment from upstream during intense storm events.

Upon completion, the pond will discharge stormwater through a storm drain structure to Arroyo Lomitas Negras.

Project Location:

Rio Rancho, New Mexico northwest of the intersection of Idalia Rd. and Loma Colorado

Watershed:

Montoyas

Estimated Construction Cost:

$3,465,720 +NMGRT

Funding Source:

Water Project Fund            State of New Mexico Capital Outlay          SSCAFCA Bond Funds

 

Start Date:

9/25/23

Estimated Completion Date:

4/12/24

Contractor

Vital Consulting Group, LLC

Project Designer:

Smith Engineering

Project Management:

SSCAFCA

Construction Oversight:

SSCAFCA

Smith Engineering 

Construction Documents

01-Construction Drawings_signed