PROJECT PURPOSE: This project will provide stormwater detention to protect downstream infrastructure from being overwhelmed during the 100-year storm event. Location: City of Rio Rancho Watershed: Black Arroyo Estimated Construction Cost: $3,438,217.00 +NMGRT Funding Source: Water Trust Board, SSCAFCA Bond Funds, State of New Mexico Capital Outlay, Private Funds Start Date: 11/25/24 Estimated Completion Date: 5/14/25 Contractor CBKN Dirtworks Project Designer: WH Pacific (NV5) Project Management: SSCAFCA Construction Oversight: SSCAFCA Construction Documents
PROJECT PURPOSE: Sunset Channel will capture the drainage coming from Sunset Pond (north of Tulip Road) in a pipe and convey it down through the subdivision to the culvert under Lisbon Avenue, and will also serve as a pathway for pedestrian use between Lisbon Ave. and Tulip Rd. Location: City of Rio Rancho Watershed: Black Arroyo Estimated Construction
Test Post
SCOPE: To eliminate aggrading issues and provide erosion protection along the Lower Arroyo Venada Bank Stabilization Project. PROJECT STATUS: Construction PROJECT DOCUMENTS: Construction Plans, Lower Arroyo Venada Project Presentation MEETINGS: Weekly Meetings will be held onsite on Wednesdays PROJECT INFORMATION: TOWN: Bernalillo WATERSHED: Venada CONSULTANT: SSCAFCA In-House CONTRACTOR: Pate Construction Company CONSTRUCTION COST: 2.8 million dollars ADVERTISE: January 2023 CONSTRUCTION