Scope: To increase flood-carrying capacity and provide erosion protection along the Arroyo de los Montoyas between NM528 and City of Rio Rancho/Village of Corrales municipal boundary.
Project Status: Construction
Project Documents: Plans
Meetings: Pre-Bid Meeting (1/21/2022), Onsite Meetings (varies)
PROJECT INFORMATION
Location:
City: Rio Rancho
Watershed: Montoyas
Consultant: Smith Engineering (Structural)
Contractor: Vital Consulting Group
Construction Cost: $3,917,248.50 + NMGRT
Advertise: February 2022
Construction Start: NTP was 4-18-2022
Construction End: 200 days (however this will change due to weather)